BREEAM Visual comfort View out
Contents |
[edit] Aim and benefits
To allow occupants to refocus their eyes from close work and enjoy an external view, reducing the risk of eyestrain and breaking the monotony of the indoor environment.
Where close work is being carried out, the availability of a view out provides an opportunity for the eyes to relax and readjust.
[edit] When to consider
RIBA stages 1 - 2
[edit] Step-by-step guidance
Areas within 7m of a window should be identified.
Check that the area of the relevant window(s) is greater than or equal to 20% of the surrounding wall. If so then the area within 7m of that window is compliant.
Permanent workstations, desks, receptions, anywhere a building user will be located for a significant amount of time (e.g. more than 30 mins) whilst carrying out work, should be located within these compliant areas. Windows or room depth could be adjusted to allow compliance.
Areas which are more than 7m from a window can still comply but BS8206 (BS 8206-2:2008 Lighting for buildings. Code of Practice for daylighting) should be consulted. Table 1 ‘Minimum glazed areas for view when windows are restricted to one wall’ of this document provides a range of percentages for the window of the wall depending on how far away the desk is. If the percentage is more than 35%, the area will comply no matter what the depth is.
The view out should be visible from a seated position unless a person would be expected to be standing at a work station.
For 2014 assessments, 95% of the floor area of the relevant building areas needs to comply to achieve the credit. For 2014 assessments, prison cells and patient occupied areas must have a view out that is not obstructed by something closer than 10m away.
[edit] Questions to ask while seeking compliance
What is the room depth?
Where are permanent workstations?
How big are the windows?
[edit] Tools and resources
BREEAM manual.
BS 8206-2:2008 Lighting for buildings. Code of Practice for daylighting.
http://kb.breeam.com/knowledgebase/level-of-view-out/
http://kb.breeam.com/knowledgebase/view-out-no-relevant-areas/
[edit] Tips and best practice
The following areas are excluded (see manual):
- Nurse bases where they are located centrally in a ward/patient area in order to enable patient observation.
- Courtrooms and interview rooms where compliance is not possible due to security or privacy criteria.
- Prison staff areas containing workstations that for security or observational purposes must be located centrally within the building.
- Any clinical areas where the control of environmental/operational conditions prevents such spaces from providing a view out.
- Conference rooms, lecture theatres, sports halls, acute Special Educational Needs (SEN) and also any spaces where the exclusion or limitation of natural light is a functional requirement, such as; laboratories, media spaces, etc.
[edit] Typical evidence
[edit] Design stage:
- Design drawings showing room depth and permanent work stations.
- Design drawings showing window sizes and location.
- Window area calculations carried out by a design team member.
[edit] Post construction:
- As built drawings showing the room depth and permanent work stations
- Confirmation from the design team of any changes to window sizes or locations.
- Assessors site inspection, room depth and location of work stations with windows.
[edit] Applicable schemes
The guidelines collated in this ISD aim to support sustainable best practice in the topic described. This issue may apply in multiple BREEAM schemes covering different stages in the life of a building, different building types and different year versions. Some content may be generic but scheme nuances should also be taken into account. Refer to the comments below and related articles to this one to understand these nuances. See this document for further guidelines.
- UK New Construction 2014
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.
--Emma Houston 11:16, 18 Jan 2018 (BST)
[edit] Related articles on Designing Buildings
Featured articles and news
Design and construction industry podcasts
Professional development, practice, the pandemic, platforms and podcasts. Have we missed anything?
C20 Society; Buildings at Risk List 2025
10 more buildings published with updates on the past decade of buildings featured.
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation, closing 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
From project managers to rising stars, sustainability pioneers and more.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.